Description

UNIT REVAMPING FCC/ 3100/ 3700 & EQUIPMENT OF GENERAL SHUT DOWN

 

Project      

:

Unit revamping FCC/ 3100/ 3700 & equipment of GENERAL SHUT DOWN

Owner

:

Motor Oil Hellas

Contract

:

2402129 – 17/04/2016

Duration

:

2 months preparation, 14 days S/D

Budget

:

1.105.821,00 €

Brief description

 

:

The project was executed in the Motor Oil (Hellas) Refinery in Corinthos, during the GSD 2016 and included the following works:

a. Maintenance works of the equipment in the units U-3100/ 3200/ 3300/ 3400/ 3600/ 3700

§  Installation of scaffolding all around equipment internally and externally in the positions of operations.

  • Installation of blinds of the isolation of the units and restoration after the end of the maintenance.
  • Opening of equipment externally and internally for inspection: towers, reactors, regenerator, filters, furnaces, vessels.
  • Repairs after the inspection: repairs in shells, repairs or replacement of the trays in towers, repairs in lining (hexmesh), Εσωτερικές επισκευές όπου προέκυψαν μετά την επιθεώρηση: επισκευές στα shell, επισκευές ή αντικατάσταση trays στους πύργους, επισκευές στην εσωτερική επένδυση (hexmesh), installing pads and stiffeners in the dip legs of the reactor R-3251, replacing the supports in furnaces, refractory replacement.
  • Externally repairs after inspection: formation and installation of pads and reinforcements, shell replacement, nozzles replacement 2” and 26” in equipment (exchanger S-3101-B, tower C-3201), quality control, and PWHT.
  • Exchangers – Air coolers

Opening, bundle extraction or replacement, repairs, replacement of 3 bundles, pressure tests, restoration.

Maintenance totally in 2 towers, 4 reactors, 1 regenerator, 2 filters, 3 furnaces, 29 exchangers, 1 air cooler, 2 vessels, 1 orifice chamber, 1 flu gas line.

b.  Piping Lines

§  Vapor Line replacement from the outlet of Reactor R-3251 to the inlet of Tower C-3201.

Line Diameter: 30", width 9,53mm, material Alloy steel P11.

Total dia inches: 1.000.

Quality Control (X-Rays) and PWHT to all the weldings.

Pressure test: 4 bar.

  • Maintenance works and new projects Piping works for products and utilities.

Prefabrication and erection of piping during shut down, partial line replacements, installing new lines

Lines Diameter: 3/4" ÷ 14", width to 10mm, materials C.S., Alloy steel.

Total dia inches: 340.

Quality Control: X-Rays 20%

Pressure test of piping: 20 bar ÷ 80 bar.

c. All type Valves replacement from 1" ÷ 24". Total pieces 38.    

The 90% of the work was done during the S/D.

All the materials and equipment was provided by the owner except the materials for the new piping supports.

The works executed for 2 months before and 14 days during S/D.

The above project was executed in parallel with the projects ‘’ Revamping of fuel & petrol units & equipment of GENERAL SHUT DOWN ‘’ and ‘’ Revamping works in  fuels, petrol, FCC units’’ on the same Shut Down period 2016.

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.